| 
Bottle
Line Control System Upgrade Replaced all existing Allen-Bradley
PLC2s with PLC5/40Es, networked via Ethernet. Added five operator workstations
running Intellution FIX 6.0. Added several variable speed drives and modified
conveying systems to provide operational flexibility by allowing multiple packaging
lines to share multiple depalletizers and palletizers. Programmed PLCs,
developed FIX applications or all workstations, which include SQL queries against
Sybase database to download pasteurizer setpoints. Integration and programming
involved the following major pieces of equipment: Depalletizer, Filler, Pasteurizer,
Labellers, Packers and Palletizer, as well as all interconnecting conveyor systems. Programming
was completed and checked out in corporate offices, and PC & E performed construction
supervision duties, checkout and startup. Project was completed on time,
meeting very tight time constraints, and under budget. Back to Success Stories | |
| Problem: |
|
Upgrade control system to improve reliability and avoid obsolescence. |
|
| Solution: |
| Emerson
Process Management worked on this project as part of their preferred-vendor contract
with the customer. | | | |